Montemurro


Southern Italy, installed capacity 29.08 MW

 

The wind farm was developed in two stages, starting in 2002, at an inland site in the south Italian Basilicata region. There are a total of 36 turbine towers with a combined capacity of 29.8 MW.

 

Montemurro 1

Number of towers:    8

Type:    Vestas V47

Capacity per tower:    660kW

Total capacity:    5.28 MW

Rotor diameter:    47 m

Hub height:    50 m

Commissioned:    2002

 

Montemurro 2

Number of towers:    28

Type:    Vestas V52

Capacity per tower:  850kW

Total capacity:       23.8 MW

Rotor diameter:    52 m

Hub height:    55 m

Commissioned:    2006