Montemurro
|
Southern Italy, installed capacity 29.08 MW
The wind farm was developed in two stages, starting in 2002, at an inland site in the south Italian Basilicata region. There are a total of 36 turbine towers with a combined capacity of 29.8 MW.
Montemurro 1 Number of towers: 8 Type: Vestas V47 Capacity per tower: 660kW Total capacity: 5.28 MW Rotor diameter: 47 m Hub height: 50 m Commissioned: 2002
Montemurro 2 Number of towers: 28 Type: Vestas V52 Capacity per tower: 850kW Total capacity: 23.8 MW Rotor diameter: 52 m Hub height: 55 m Commissioned: 2006 |
|
